Tuesday, October 04, 2011




I spent TWO months on TWO projects.  Normally I would have whipped them out in a couple weeks, but these customers knew (or didn't....) exactly what they wanted and we went through a number of modifications before the physical matched the picture in their heads :)  
 The first version of the wedding dress was full with an asymmetrical hemline, it ended up being a much more fitted affair by the end :)  Lots of changes, fittings, ripping, but finally the king sized tee-shirt quilt and the wedding dress left the building.  whew...    Now I am about a month behind on my production pieces. Late nights await.

I have 14 new bags cut out and ready to sew for the fall/holiday bazaar season.  Time is limited, so I need to put my nose to the grindstone.  African Mudcloth, Guatemalan handwovens; Dutch wax batiks, Bali batiks, I just love these ethnic fabrics mixed with the Italian lambskin.                

1 comment:

Katy said...

I have a bag of t-shirts that are in need of being a t-shirt quilt. I have heard they are tough though :( PS. the dress is ADORABLE! Also, do you do TuTu's? :) I have a certain 2 year old who wants to be a cat for halloween and i am in need of a black tutu...feminine, poofy but not too poofy :) suggestions?!